ANAHEIM CONVENTION CENTER CHILLER REPLACEMENTS
PROJECT OVERVIEW
The Anaheim Convention Center includes 1.15 million SF of exhibit space and is the largest exhibit facility on the West Coast. Linwood Engineering was contracted to provide design services for (2) Chiller replacement projects serving Hall A and Hall C respectively.
HALL A
Project scope included the replacement of an existing 52-year-old centrifugal chiller conditioning 145,841 SF of exhibit space. Linwood Engineering, Inc. provided Mechanical, Plumbing, and Construction Administration services as part of a Design-Build group.
HALL C
The project followed a traditional Design-Bid-Build delivery method. Scope included the replacement of (2) existing 40-year-old centrifugal chillers conditioning 155,673 SF of exhibit space. Linwood Engineering, Inc. provided MEP design directly to Anaheim Convention Center.
SERVICES
Mechanical
Electrical
Plumbing